STATION WORKING RULES

Appendix - XIV

Comprehensive guide to station working rules and procedures for railway operations, ensuring systematic control and monitoring of train movements.

Topics Covered in Station Working Rules

1

Station Working Rule diagram

2

Description of station

3

General (location)

4

Block stations, IBH, IBS on either side and their distance and Outlying Sidings

5

Block section limits on either side of the station on different directions

6

Gradients, if any

7

Layout

8

Running lines, Direction of movement & holding capacity in CSR

9

Non running lines and their capacity in CSR

10

Any special feature in the layout

11

Level crossings

12

System and means of working

13

System of signalling and interlocking

14

Custody of Relay Room key and procedure for its handing over and taking over between Station Master and S&T maintenance staff

15

Power supply

16

Telecommunication

17

System of train working

18

Duties of train working staff

19

Train working staff in each shift

20

Responsibility for ascertaining clearance of the lines and Zones of responsibility

21

Assurance of staff in the assurance register

22

Conditions for granting Line Clear

23

Any special conditions to be observed while receiving or despatching a train

24

Conditions for taking 'off' approach signals

25

Commissioner of Railway Safety approval

26

Responsibility of Station Master for restoration of signals to 'on'

27

Simultaneous reception/despatch, crossing and precedence of trains

28

Complete arrival of trains

29

Despatch of trains

30

Trains running through

31

Working in case of failure

32

Provision for working of trollies/motor trollies /material lorries

33

Blocking of lines

34

Shunting

35

Abnormal conditions

36

Total failure of communication

37

Temporary single line working on double line section

38

Despatch of train under authority to proceed without Line Clear or to assist the crippled train (T/A.602)

39

Visibility Test Object

40

Essential equipment at the station

41

Fog signalmen nominated to be called in case of fog

Essential Appendices

Comprehensive documentation and procedures for railway operations

🚦

Appendix 'A'

Working of Level Crossing Gates

(Interlocked LC gates – to be jointly signed by DSTE, DOM & DEN) (Non-interlocked LC gates – to be jointly signed by DEN & DOM)

Appendix 'B'

System of signaling and interlocking and communication arrangements at the station

(to be signed by DSTE)

🛡️

Appendix 'C'

Anti Collision Device (Raksha Kavach)

(as and when brought into force)

👥

Appendix 'D'

Duties of train passing staff and staff in each shift

(to be signed by DOM)

🔧

Appendix 'E'

List of essential equipment provided at the station

(to be signed by DOM)

🚉

Appendix 'F'

Rules for working of DK stations, Halts, IBH, IBS and outlying sidings

(to be jointly signed by DOM & DSTE)

Appendix 'G'

Rules for working trains in electrified sections

(to be jointly signed by Sr.DOM, Sr.DEE (TRD) & Sr.DSTE or DOM, DEE(TRD) & DSTE)

Key Features & Benefits

🚦Comprehensive signal management and interlocking systems
Real-time monitoring and control of train operations
🛡️Enhanced safety protocols and collision prevention
👥Clear staff responsibilities and shift management
🔧Essential equipment management and maintenance
🚉Specialized rules for different station types and operations

Implementation Guidelines

Documentation Requirements

📋All appendices must be properly signed by authorized personnel
🔐Regular updates and maintenance of working rules
📊Systematic monitoring and reporting procedures
Integration with modern railway control systems